Request Received

EGA Application
Thank you, your form has been received. Please contact us on 13 10 87 if you have not received a response to this application after 24 hours.

Next steps

You are required to complete these additional forms to finalize your request.
Your Reference Code is:
Please quote your reference code when enquiring about your submission.

For your records

Would you like a copy of this submission for your personal records?
OR

Check your email

We've sent a copy of your submission to the email address provided () and will send approval or advise of further assessment within 24 hours.
OR

Share form

Do you want to allow other people to access your form?
We've sent a link to your specified recipient. If you would like share your form again, just click the link below.

Share form

Enter the email of the person you wish to share with and optionally a personal message.

Request Saved

EGA Application
Your form has been saved and may be re-opened later.
Your Reference Code is:
Form expires on .

Send yourself a reminder email

Enter your email address and we'll send you instructions on how to return to your form.
Email yourself this reference code

Check your email

We've sent instructions to the email address provided () on how to return to the application when you are ready.

Site

Embedded Generation Application
Fields marked with * are required
Please check that you have entered the number correctly, if so please contact your electricity retailer.
Inverters may not be connected to a temporary supply. Please check that you have entered the number correctly, if so please contact your electricity retailer.
The form has previously been saved. Please click Find RRN and select address to re-validate before proceeding.
The Retailer Reference number has not been found. Please check that you have entered the number correctly, if so please contact your electricity retailer.
Your supply phase is

System

Embedded Generation Application
Fields marked with * are required
All inverters are not balanced across supply phases to Western Power's requirement..
I have an existing battery that I will continue to use

Existing Battery

Inbuilt inverter - deleting this battery will delete existing inverter
I want to add a new battery

New Battery

Inbuilt inverter - deleting this battery will delete new inverter
Storage system details
I have an existing inverter that I will continue to use

Existing Inverter

Inbuilt inverter - to delete this inverter, delete existing battery
Existing energy source being retained
I want to add a new inverter

New Inverter

Inbuilt inverter - to delete this inverter, delete new battery
New energy source being added

Summary

Embedded Generation Application
Fields marked with * are required
Existing being retained
New being added
Total
Usable energy capacity per unit kWh
Inverter capacity kVA
Energy source PV kW
Energy source Wind kW
Energy source Hydro kW
Energy source Fuel kVA
Energy source Other

Attachment

Embedded Generation Application
Fields marked with * are required
Please attach your site plan
Attach site diagram
Attach single line diagram
Attach additional information (optional)
File:
File:
File:
No Attachments Required.

Declaration

Embedded Generation Application
Fields marked with * are required
As the Applicant I confirm that:
Will rely upon information supplied by me in this application

Is under no obligation to verify the application details

Will assess the inverter energy system as operating at its full rated capacity or as appropriate for batteries

Does not approve applications where the system exceeds the limits advised by the connection point’s electricity retailer.

Is not obliged to approve the application if it considers that the power system performance standards will not be met as a consequence of the operation of the energy system

Applicant

Embedded Generation Application
Fields marked with * are required
As the applicant, I warrant that:
© Copyright Avoka Technologies 2019